Statement of work · Draft

Deliver the split ingestion path through controlled handoff

RFC 014 moves from design through v2.0.0 and handoff inside a 24 engineer-week delivery cap.

Window: 2026-08-31–2026-11-20Basis: supplied delivery terms

Services and boundary

Design, build, verify, release, and hand over the dispatcher, two queues and consumer groups, observability, operator overview, chaos evidence, cutover, and runbooks.

Deliverables and acceptance

DeliverableAcceptance ownerGate
Design and requirementsPlatform director2026-09-01
Staging path and chaos evidenceReliability2026-10-28
v2.0.0 and support materialPlatform2026-11-20

Responsibilities and exclusions

Platform supplies delivery capacity; Reliability approves failure behavior; producer teams supply retry fixtures. Payload, authentication, warehouse schema, batch path, retention, rates, payment terms, and legal clauses are excluded.

Changes use the approved change-request process. CR-003 is not included.