Test strategy · v2.0.0
Quality evidence follows the failure risks, not the component list
Readiness on 2026-10-28 depends on staging and the two-queue chaos environment.
Risk-led test layers
Contract
API and error behavior · Platform.
Component
Partition and warehouse writes · Platform.
Chaos
One queue down · Reliability.
Producer
Checkout, Catalog, Inventory retries.
Cutover
Reconciliation and rollback rehearsal.
Evidence schedule
- Entry
Chaos environment available.
- Trace
REQ-101 through REQ-105 linked to tests.
- Exit
No blockers; chaos executed; residual risk accepted.